Zcamp
Zcamp P7 Modern Prefab House With Balcony
Peripheral protection system
- Galvanized steel frame
- Fluorocarbon aluminum alloy shell
- Insulated, waterproof and moisture-proof construction
- Tempered laminated glass skylight
- Hollow tempered glass windows
- Stainless steel side-hinged entry door
- Panoramic balcony
Exquisite interior decoration
- Integrated modular ceiling & wall
- Stone plastic composite floor.
- Privacy glass door for bathroom
- Marble floor for bathroom
- Washstand/washbasin/bathroom mirror
- Bathroom hook/shelf/towel rack
- Toilet /faucet /shower /floor drain
- Whole house lighting system
- Whole house plumbing &electrical system
- Blackout curtains
- Air conditioner
- Whole house screen door
Intelligent Voice Control System
- Key card switch
- Lights & curtains with intelligent integrated control
- Multiple scenario modes
- Intelligent voice control
- Smart lock
Process
Packing and shipping
1. Transportation stage
The transport truck is required to be a 13.5m long semi-trailer, with a transport width of 3m and a transport height of no more than 4.2m. Flatbed cabinets are required for transportation abroad.
2. Hoisting stage
After the goods arrive at the site, customers need to contact the local crane service themselves, and our technical team will provide remote guidance. The weight of the entire series of products ranges from 6 to 10 tons. It is recommended to use a crane of no less than 25 tons for loading and unloading.
3. Installation stage
Before installation, customers need to complete the on-site engineering of water supply, electricity supply, sewage pipelines and load-bearing foundation in accordance with our company's product standard basic hydropower drawings. Under the guidance of our technicians, we accurately positioned it at the designed installation point. After connecting water and electricity, we completed the water and electricity test and submitted it to the customer for acceptance.